CE-UY 3513 Construction Scheduling3 Credits Students learn to apply the Critical Path Method (CPM) to construction projects, using precedence diagram networks. The course covers sequencing, cost allocation, updating, cash flow, resource constraints and scheduling, manpower leveling and distribution, time-scale networks, lead and lag-time constraints, time-cost tradeoffs, overlap and other specific leading edge scheduling techniques. Students direct an entire project from planning through scheduling and control, both manually and through software.
Prerequisite(s): One CE-UY 25xx course must be completed before enrolling in any CE-UY 35xx or 45xx course; A second CE-UY 25xx course is a co-requisite for a second CE-UY 35xx or CE-UY 45xx course Weekly Lecture Hours: 2.5 | Weekly Lab Hours: 1.5 | Weekly Recitation Hours: 0
|
|
|